PREVIOUS WORK

Pride in our work.

IMG_4937.JPG

GOLDEN EAGLE HOTEL

February 2012 - May 2012

The works included the environmental clean and removal of asbestos prior to demolition. A wooden security hoarding was erected. 
The demolition of the 4 storey hotel followed the demolition of the former nursing home to the rear.

IMG_1126.JPG

HILLSIDE ROAD, HUYTON

April 2015

Oldham Bros were called to carry out an emergency demolition of a row of fire damaged shop units in Huyton.
Working alongside the local council, fire brigade and engineers from the affected utility companies the site was secured and the building brought down safely ensuring there was no collapse in the attached shop units which were not damaged by the fire.

IMAG0799.jpg

ANFIELD, LIVERPOOL

July 2014 - 2017

The demolition of the terraced houses on Lothair Road, Rockfield road, Alroy Road and Anfield Road were completed on time and were followed by Carillion who began works on the expansion of the main stand for Liverpool Football Club.

This was a high profile job which we were delighted to be a part of.

Work continues as part of the wider regeneration programme for Liverpool Council.

31.3.11 (35).jpg

BALLIOL HOUSE

October 2010 - July 2011

High rise demolition of multi storey office block Balliol House, Bootle, Liverpool.
The works comprised of the removal of asbestos, full height scaffholding to all elevations and the deconstruction o the high rise block. A high reach excavator was also used once the height had been reduced to a safe working level.
Following the demolition a car park was constructed with a key code barrier and with trees planted around the site boundary.

TANK DISMANTLING

7th December 2018

This tank dismantling saw the removal of redundant, decommissioned oil tanks. The removal was accompanied by the dismantling of pipe work and all lifts were organised by Oldham Bros.